﻿{"id":13,"date":"2021-09-16T18:56:33","date_gmt":"2021-09-16T18:56:33","guid":{"rendered":"https:\/\/www.consealsdnbhd.com\/?page_id=13"},"modified":"2021-12-20T10:29:49","modified_gmt":"2021-12-20T10:29:49","slug":"projects","status":"publish","type":"page","link":"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/","title":{"rendered":"PROJECTS"},"content":{"rendered":"\n<h3>PROJECT LRT<\/h3>\n\n\n\n<h5><strong>SUNWAY CONSTRUCTION SDN BHD<\/strong><\/h5>\n\n\n\n<p>MICROPILE , ROCK HAMMERING WORKS<br>SUNWAY (PUTRAHEIGHT) THE CONSTRUCTION AND COMPLETION OF FACILITIES WORKS (PACKAGE B) FOR THE KELANA JAYA (KLJ) LINE EXTENSION PROJECT (the \u201cworks\u201d) PRASARANA\/GCS\/CTT\/2.0326\/2011 &amp; (USJ 8) KELANA JAYA LINE EXTENSION PROJECT THE CONSTRUCTION AND COMPLETION OF FACILITIES WORKS (PACKAGE B1 &amp; B2 : FROM CH 9250 TO CH 17350) MICROPILES AT STATION 8 (USJ 9) KELANA JAYA LINE EXTENSION PROJECT THE CONSTRUCTION AND COMPLETION OF FACILITIES WORKS (PACKAGE B1 &amp; B2 : FROM CH 9250 TO CH 17350) MICROPILES AT STATION 9<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"947\" height=\"1024\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/LRT-1-947x1024.jpg\" alt=\"\" class=\"wp-image-293\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/LRT-1-947x1024.jpg 947w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/LRT-1-278x300.jpg 278w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/LRT-1-768x830.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/LRT-1-1421x1536.jpg 1421w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/LRT-1-1895x2048.jpg 1895w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/LRT-1-107x116.jpg 107w\" sizes=\"(max-width: 947px) 100vw, 947px\" \/><\/figure>\n\n\n\n<h3>PROJECT BRT<\/h3>\n\n\n\n<h5><strong>SUNWAY CONSTRUCTION SDN BHD<\/strong><\/h5>\n\n\n\n<p>MICROPILE WORKS<br>SUNWAY CADANGAN MEREKABENTUK, MEMBINA, MELENGKAP, MENYIAPKAN DAN MENYELENGGARAKAN KERJA-KERJA 1) LALUAN BAS DAN HENTIAN BAS; 2) DEPOT; 3) TEMPAT LETAK KERETA BERTINGKAT; 4) \u201c MECHANIZATION OXIDATION POND\u201d UNTUK BAS RAPIT TRANSIT (\u201cBRT\u201d) &#8211; LALUAN SUNWAY<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"916\" height=\"1024\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT2-916x1024.jpg\" alt=\"\" class=\"wp-image-297\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT2-916x1024.jpg 916w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT2-268x300.jpg 268w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT2-768x858.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT2-1374x1536.jpg 1374w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT2-1833x2048.jpg 1833w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT2-104x116.jpg 104w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT2.jpg 2008w\" sizes=\"(max-width: 916px) 100vw, 916px\" \/><\/figure>\n\n\n\n<h3>PROJECT TNB MANJUNG POWER SUPPLY FACTORY<\/h3>\n\n\n\n<h5><strong>ONLINE ENGINEERING SERVICES SDN BHD<\/strong><\/h5>\n\n\n\n<p>MICROPILE WORKS<br>KERJA-KERJA MEMBAIKPULIH MENDAPAN STRUKTUR TAPAK ASAS DI LAPANGAN SUIS PMU 500KV JANAMANJUNG BAGI PEJABAT PENGURUS NEGERI (PERAK), JABATAN SENGGARAAN ASET, BAHAGIAN PENGHANTARAN TNB<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"916\" height=\"1024\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT10-916x1024.jpg\" alt=\"\" class=\"wp-image-298\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT10-916x1024.jpg 916w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT10-268x300.jpg 268w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT10-768x858.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT10-1374x1536.jpg 1374w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT10-1833x2048.jpg 1833w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT10-104x116.jpg 104w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT10.jpg 2008w\" sizes=\"(max-width: 916px) 100vw, 916px\" \/><\/figure>\n\n\n\n<h3>PROJECT MEX 1 HIGHWAY<\/h3>\n\n\n\n<h5><strong>PEMBINAAN MELIMA (M) SDN. BHD<\/strong><\/h5>\n\n\n\n<p>MICROPILE WORKS<br>MEX1 \u2013 PROTECTION TO ABUTMENT AT SG.KERAYONG<br>SUB-CONTRACT FOR MICROPILING WORK<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"916\" height=\"1024\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT11-916x1024.jpg\" alt=\"\" class=\"wp-image-299\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT11-916x1024.jpg 916w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT11-268x300.jpg 268w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT11-768x858.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT11-1374x1536.jpg 1374w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT11-1833x2048.jpg 1833w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT11-104x116.jpg 104w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT11.jpg 2008w\" sizes=\"(max-width: 916px) 100vw, 916px\" \/><\/figure>\n\n\n\n<h3>PROJECT PARADIGM JB MALL<\/h3>\n\n\n\n<h5><strong>WCT HOLDINGS BERHAD<\/strong><\/h5>\n\n\n\n<p>MICROPILES &amp; UNDERPINNING WORKS<br>WCT PEMBANGUNAN PERDAGANGAN 22 TINGKAT YANG MENGANDUNGI 10 TINGKAT PODIUM YANG MNEGANDUNGI 6 TINGKAT KOMPLEKS MEMBELI BELAH &#8211; 2 TINGKAT APARTMENT SERVIS (8 UNIT) KEMUDAHAN DAN 2 TINGKAT LETAK KENDERAAN BERSERTA 1 TINGKAT LETAK KENDERAAN BAWAH TANAH 22 TINGKAT MENARA A APARTMENT SERVIS (225 UNIT) DI ATAS LOT PTD 32665 , JALAN MEWAH RIA 2, TAMAN BUKIT MEWAH, MUKIM TEBRAU, DAERAH JOHOR BAHRU.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"916\" height=\"1024\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT6-916x1024.jpg\" alt=\"\" class=\"wp-image-300\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT6-916x1024.jpg 916w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT6-268x300.jpg 268w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT6-768x858.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT6-1374x1536.jpg 1374w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT6-1833x2048.jpg 1833w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT6-104x116.jpg 104w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT6.jpg 2008w\" sizes=\"(max-width: 916px) 100vw, 916px\" \/><\/figure>\n\n\n\n<h3>PROJECT SKYPARK CYBERJAYA<\/h3>\n\n\n\n<h5>DYNABRIDGE SDN NHD<\/h5>\n\n\n\n<p>BORED PILES &amp; CBP WORKS<br>CADANGAN PEMBANGUNAN KOMPLEKS PERNIAGAAN YANG MENGANDUNGI HOTEL, SOHO, PEJABAT,RUANG PERNIAGAAN DAN TEMPAT LETAK KERETA DI ATAS LOT 11992, JALAN TEKNOKRAT 1, CYBER 3, MUKIM DENGKIL, DAERAH<br>SEPANG, SELANGOR (SKYPARK-CYBERJAYA)<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"916\" height=\"1024\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT5-916x1024.jpg\" alt=\"\" class=\"wp-image-303\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT5-916x1024.jpg 916w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT5-268x300.jpg 268w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT5-768x858.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT5-1374x1536.jpg 1374w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT5-1833x2048.jpg 1833w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT5-104x116.jpg 104w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT5.jpg 2008w\" sizes=\"(max-width: 916px) 100vw, 916px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h3>PROJECT MRT<\/h3>\n\n\n\n<h5>CHINA RAILWAY 17TH BUREAUGROUP (M) SDN BHD<\/h5>\n\n\n\n<p>MICROPILE WORKS<br>MRT V201 PACKAGE V205 CRCC PROJECT MAS RAPIT TRANSIT LALUAN 2 SUNGAI BULOH &#8211; SERDANG &#8211; PUTRAJAYA (SSP) PACKAGE S205 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT SUNGAI BESI, TECHNOLOGY PARK &amp; SERDANG RAYA (NORTH) MICRO PILE WORKS FOR SUNGAI BESI STATION &amp; SERDANG RAYA NORTH STATION<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"916\" height=\"1024\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT8-916x1024.jpg\" alt=\"\" class=\"wp-image-305\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT8-916x1024.jpg 916w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT8-268x300.jpg 268w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT8-768x858.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT8-1374x1536.jpg 1374w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT8-1833x2048.jpg 1833w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT8-104x116.jpg 104w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT8.jpg 2008w\" sizes=\"(max-width: 916px) 100vw, 916px\" \/><\/figure>\n\n\n\n<h3>PROJECT ULU JELAI HYDRO ELECTRIC<\/h3>\n\n\n\n<h5>GPSS GEOTECHNIC SDN BHD<\/h5>\n\n\n\n<p>SOIL NAILING, GUNITING &amp; HORIZONTAL DRAIN WORKS<br>ULU JELAI HYDRO ELECTRIC PROJECT ~ ACCESS ROAD TO LEMOI INTAKE AND BRIDGE OVER SG.LEMOI ~ ACCESS ROAD TO LEMOI INTAKE AND BRIDGE OVER SG.LEMOI<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"916\" height=\"1024\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT12-916x1024.jpg\" alt=\"\" class=\"wp-image-307\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT12-916x1024.jpg 916w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT12-268x300.jpg 268w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT12-768x858.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT12-1374x1536.jpg 1374w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT12-1833x2048.jpg 1833w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT12-104x116.jpg 104w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT12.jpg 2008w\" sizes=\"(max-width: 916px) 100vw, 916px\" \/><\/figure>\n\n\n\n<h3>PROJECT MOUNT ERSKIN<\/h3>\n\n\n\n<h5>VST CEMERLANG SDN. BHD.<\/h5>\n\n\n\n<p>MICROPILE WORKS<br>CADANGAN PEMBANGUNAN PERUMAHAN UNTUK MENDIRIKAN:<br>A) 2 BLOK 38 TINGKAT PANGSAPURI KOS SEDERHANA (473 UNIT) TERMASUK 6 TINGKAT TEMPAT LETAK KENDERAAN DAN 1 TINGKAT KEMUDAHAN MASYARAKAT\/ RUANG REKREASI.<br>B) 1 BLOK 21 TINGKAT RUMAH PANGSA KOS SEDERHANA RENDAH (142 UNIT) TERMASUK 4 TINGKAT TEMPAT LETAK KENDERAAN DAN 1 TINGKAT KEMUDAHAN MASYARAKAT\/ RUANG REKREASI<br>JALAN MOUNT ERSKIN, DIA ATAS LOT 3618, MUKIM 18, DAERAH TIMUR LAUT, PULAU PINANG UNTUK TETUAN VISENTAK CAPITAL SDN BHD<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"916\" height=\"1024\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT15-916x1024.jpg\" alt=\"\" class=\"wp-image-310\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT15-916x1024.jpg 916w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT15-268x300.jpg 268w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT15-768x858.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT15-1374x1536.jpg 1374w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT15-1833x2048.jpg 1833w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT15-104x116.jpg 104w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT15.jpg 2008w\" sizes=\"(max-width: 916px) 100vw, 916px\" \/><\/figure>\n\n\n\n<h3>PROJECT IOI PROPERTIES<\/h3>\n\n\n\n<h5>IOI PROPERTY SDN BHD<\/h5>\n\n\n\n<p>MICROPILE WORKS<br>MICROPILE AT SOUTHERN TRUMPET TUNNEL AND RAMP FOR CADANGAN PEMBANGUNAN PERNIAGAAN SECARA BERFASA YANG MELIBATKAN :- FASA 2 DI ATAS PT 83 DAN PT 50430, IOI RESORT CITY, MUKIM DENGKIL DAERAH SEPANG, SELANGOR DARUL EHSAN UNTUK TETUAN MAYANG DEVELOPMENT SDN BHD<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"916\" height=\"1024\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/12\/ioi-916x1024.jpg\" alt=\"\" class=\"wp-image-504\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/12\/ioi-916x1024.jpg 916w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/12\/ioi-268x300.jpg 268w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/12\/ioi-768x858.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/12\/ioi-1374x1536.jpg 1374w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/12\/ioi-1833x2048.jpg 1833w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/12\/ioi-104x116.jpg 104w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/12\/ioi.jpg 2008w\" sizes=\"(max-width: 916px) 100vw, 916px\" \/><\/figure>\n\n\n\n<h3>PROJECT 3 ELEMENTS<\/h3>\n\n\n\n<h5>SAFETAGS SOLUTION SDN BHD<\/h5>\n\n\n\n<p>MICROPILING AND SLOPE STRENGTHENING WORKS<br>3 ELEMENTS SRI KEMBANGAN, PHASE 2 CADANGAN PEMBANGUNAN PUSAT PERNIAGAAN 28 TINGKAT YANG MENGANDUNGI :- I) 3 TINGKAT TEMPAT LETAK KERETA (TINGKAT BESMEN,TINGKAT BAWAH &amp; 1), II) 4 TINGKAT PODIUM PERNIAGAAN (TINGKAT1-4), III) 5 TINGKAT TEMPAT LETAK KERETA (TINGKAT 5-9), IV) 1 BLOK (342 UNIT) PANGSAPURI PERKHIDMATAN 18 TINGKAT (TINGKAT 10-27), V) 1 UNIT PERHENTIAN BAS DI ATAS LOT 100010 (PT73891), PERSIARAN PUTRA PERMAI SELESA, PUSAT BANDAR PUTRA PERMAI, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN SAFETAGS SOLUTION SDN BHD<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT14-916x1024.jpg\" alt=\"\" class=\"wp-image-318\" width=\"841\" height=\"940\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT14-916x1024.jpg 916w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT14-268x300.jpg 268w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT14-768x858.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT14-1374x1536.jpg 1374w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT14-1833x2048.jpg 1833w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT14-104x116.jpg 104w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT14.jpg 2008w\" sizes=\"(max-width: 841px) 100vw, 841px\" \/><\/figure>\n\n\n\n<h3>PROJECT PAVILLION<\/h3>\n\n\n\n<h5>GBC INTERIOR &amp; ENGINEERING WORKS<\/h5>\n\n\n\n<p>MICROPILE WORKS<br>RECONFIGURE MRT PORTALS @ PAVILION DAMANSARA HEIGHT<br>168, BUKIT BINTANG STREET, BUKIT BINTANG, 55100 KUALA LUMPUR,<br>FEDERAL TERRITORY OF KUALA LUMPUR<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT3-916x1024.jpg\" alt=\"\" class=\"wp-image-321\" width=\"840\" height=\"939\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT3-916x1024.jpg 916w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT3-268x300.jpg 268w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT3-768x858.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT3-1374x1536.jpg 1374w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT3-1833x2048.jpg 1833w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT3-104x116.jpg 104w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT3.jpg 2008w\" sizes=\"(max-width: 840px) 100vw, 840px\" \/><\/figure>\n\n\n\n<h3>PROJECT URBAN WELLNESS PULAI JOHOR<\/h3>\n\n\n\n<h5>ML BORED PILES SDN BHD<\/h5>\n\n\n\n<p>GROUND ANCHOR<br>PROPOSED \u2018URBAN WELLNESS\u2019 DEVELOPMENT FOR PULAU INDAH VENTURES SDN BHD. KOMPLEKS BANGUNAN \u201cURBAN WELLNESS\u201d DI ATAS LOT PTD 17069 MUKIM PULAI, JOHOR BAHRU, JOHOR<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"916\" height=\"1024\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT7-916x1024.jpg\" alt=\"\" class=\"wp-image-322\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT7-916x1024.jpg 916w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT7-268x300.jpg 268w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT7-768x858.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT7-1374x1536.jpg 1374w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT7-1833x2048.jpg 1833w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT7-104x116.jpg 104w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT7.jpg 2008w\" sizes=\"(max-width: 916px) 100vw, 916px\" \/><\/figure>\n\n\n\n<h3>PROJECT KTM<\/h3>\n\n\n\n<h5>JASMADU &#8211; MKH BERHAD<\/h5>\n\n\n\n<p>BORED PILE, MICROPILE &amp; SPUN PILE WORKS<br>TENDER FOR PILING &amp; SUB-STRUCTURE WORKS FOR CADANGAN PEMBANGUNAN MENDIRIKAN SEBUAH STESEN KOMUTER BERSEPADU KAJANG 2 BERSERTA KEMUDAHAN SOKONGAN IAITU: &#8211; FASA 1 BANGUNAN STESEN KOMUTER 2 TINGKAT DENGAN KEMUDAHAN SOKONGAN (TERMASUK PEJABAT PENGURUSAN KIOSK JUALAN TIKET, PUSAT PENERANGAN PERLANCONGAN, SURAU &amp; PENCAWANG ELEKTRIK TNB) DAN JEJANTAS PEJALAN KAKI YANG BERBUMBUNG KE KOMPLEKS PERHENTIAN KAJANG DI ATAS LOT SEBAHAGIAN REZAB PERBADANAN ASET KERETAPI DAN LOT 853, MUKIM KAJANG, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN PERBADANAN ASET KERETAPI (RAILWAY ASSET CORPORATION)JEJANTAS PEJALAN KAKI YANG BERBUMBUNG KE KOMPLEKS PERHENTIAN KAJANG DI ATAS LOT SEBAHAGIAN REZAB PERBADANAN ASET KERETAPI DAN LOT 853, MUKIM KAJANG, DAERAH HULU LANGAT, SELANGOR UNTUK TETUAN PERBADANAN ASET KERETAPI (RAILWAY ASSET CORPORATION)<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"916\" height=\"1024\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT9-916x1024.jpg\" alt=\"\" class=\"wp-image-323\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT9-916x1024.jpg 916w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT9-268x300.jpg 268w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT9-768x858.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT9-1374x1536.jpg 1374w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT9-1833x2048.jpg 1833w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT9-104x116.jpg 104w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT9.jpg 2008w\" sizes=\"(max-width: 916px) 100vw, 916px\" \/><\/figure>\n\n\n\n<h3>PROJECT FOREST CITY<\/h3>\n\n\n\n<h5>CHINA STATE CONSTRUCTION ENGINEERING (M) SDN BHD<\/h5>\n\n\n\n<p>GUNITING WORKS<br>FOREST CITY LANDMARK PHASE 1. FOREST CITY COUNTRY GARDEN FOREST CITY 1, PULAU SATU, GELANG PATAH, 81550 JOHOR BAHRU, JOHOR (187.27 MI)<br>JOHOR BAHRU<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"916\" height=\"1024\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT13-916x1024.jpg\" alt=\"\" class=\"wp-image-324\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT13-916x1024.jpg 916w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT13-268x300.jpg 268w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT13-768x858.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT13-1374x1536.jpg 1374w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT13-1833x2048.jpg 1833w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT13-104x116.jpg 104w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT13.jpg 2008w\" sizes=\"(max-width: 916px) 100vw, 916px\" \/><\/figure>\n\n\n\n<h3>PROJECT MRT<\/h3>\n\n\n\n<h5>SUNWAY CONSTRUCTION SDN BHD<\/h5>\n\n\n\n<p>SOIL NAILING WORKS<br>PROJEK MASS RAPID TRANSIT LEMBAH KELANG: JAJARAN SUNGAI BULOH &#8211; KAJANG PACKAGE V4: CONSTRUCTION AND COMPLETION OF VIADUCT GUIDEWAY AND OTHER ASSOCIATED WORKS FROM SECTON 17 TO SEMANTAN PORTAL. &#8211; MRT<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"916\" height=\"1024\" src=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT16-916x1024.jpg\" alt=\"\" class=\"wp-image-325\" srcset=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT16-916x1024.jpg 916w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT16-268x300.jpg 268w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT16-768x858.jpg 768w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT16-1374x1536.jpg 1374w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT16-1833x2048.jpg 1833w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT16-104x116.jpg 104w, https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/MRT16.jpg 2008w\" sizes=\"(max-width: 916px) 100vw, 916px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>PROJECT LRT SUNWAY CONSTRUCTION SDN BHD MICROPILE , ROCK HAMMERING WORKSSUNWAY (PUTRAHEIGHT) THE CONSTRUCTION AND COMPLETION OF FACILITIES WORKS (PACKAGE B) FOR THE KELANA JAYA (KLJ) LINE EXTENSION PROJECT (the \u201cworks\u201d) PRASARANA\/GCS\/CTT\/2.0326\/2011 &amp; (USJ 8) KELANA JAYA LINE EXTENSION PROJECT THE CONSTRUCTION AND COMPLETION OF FACILITIES WORKS (PACKAGE B1 &amp; B2 : FROM CH 9250 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v17.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>PROJECTS - Conseal Sdn Bhd<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PROJECTS - Conseal Sdn Bhd\" \/>\n<meta property=\"og:description\" content=\"PROJECT LRT SUNWAY CONSTRUCTION SDN BHD MICROPILE , ROCK HAMMERING WORKSSUNWAY (PUTRAHEIGHT) THE CONSTRUCTION AND COMPLETION OF FACILITIES WORKS (PACKAGE B) FOR THE KELANA JAYA (KLJ) LINE EXTENSION PROJECT (the \u201cworks\u201d) PRASARANA\/GCS\/CTT\/2.0326\/2011 &amp; (USJ 8) KELANA JAYA LINE EXTENSION PROJECT THE CONSTRUCTION AND COMPLETION OF FACILITIES WORKS (PACKAGE B1 &amp; B2 : FROM CH 9250 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/\" \/>\n<meta property=\"og:site_name\" content=\"Conseal Sdn Bhd\" \/>\n<meta property=\"article:modified_time\" content=\"2021-12-20T10:29:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/LRT-1-947x1024.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.consealsdnbhd.com\/#website\",\"url\":\"https:\/\/www.consealsdnbhd.com\/\",\"name\":\"Conseal Sdn Bhd\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.consealsdnbhd.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/LRT-1.jpg\",\"contentUrl\":\"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/LRT-1.jpg\",\"width\":2185,\"height\":2362},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/#webpage\",\"url\":\"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/\",\"name\":\"PROJECTS - Conseal Sdn Bhd\",\"isPartOf\":{\"@id\":\"https:\/\/www.consealsdnbhd.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/#primaryimage\"},\"datePublished\":\"2021-09-16T18:56:33+00:00\",\"dateModified\":\"2021-12-20T10:29:49+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.consealsdnbhd.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PROJECTS\"}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"PROJECTS - Conseal Sdn Bhd","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/","og_locale":"en_US","og_type":"article","og_title":"PROJECTS - Conseal Sdn Bhd","og_description":"PROJECT LRT SUNWAY CONSTRUCTION SDN BHD MICROPILE , ROCK HAMMERING WORKSSUNWAY (PUTRAHEIGHT) THE CONSTRUCTION AND COMPLETION OF FACILITIES WORKS (PACKAGE B) FOR THE KELANA JAYA (KLJ) LINE EXTENSION PROJECT (the \u201cworks\u201d) PRASARANA\/GCS\/CTT\/2.0326\/2011 &amp; (USJ 8) KELANA JAYA LINE EXTENSION PROJECT THE CONSTRUCTION AND COMPLETION OF FACILITIES WORKS (PACKAGE B1 &amp; B2 : FROM CH 9250 [&hellip;]","og_url":"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/","og_site_name":"Conseal Sdn Bhd","article_modified_time":"2021-12-20T10:29:49+00:00","og_image":[{"url":"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/LRT-1-947x1024.jpg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.consealsdnbhd.com\/#website","url":"https:\/\/www.consealsdnbhd.com\/","name":"Conseal Sdn Bhd","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.consealsdnbhd.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/#primaryimage","inLanguage":"en-US","url":"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/LRT-1.jpg","contentUrl":"https:\/\/www.consealsdnbhd.com\/wp-content\/uploads\/2021\/09\/LRT-1.jpg","width":2185,"height":2362},{"@type":"WebPage","@id":"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/#webpage","url":"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/","name":"PROJECTS - Conseal Sdn Bhd","isPartOf":{"@id":"https:\/\/www.consealsdnbhd.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/#primaryimage"},"datePublished":"2021-09-16T18:56:33+00:00","dateModified":"2021-12-20T10:29:49+00:00","breadcrumb":{"@id":"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.consealsdnbhd.com\/index.php\/projects\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.consealsdnbhd.com\/index.php\/projects\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.consealsdnbhd.com\/"},{"@type":"ListItem","position":2,"name":"PROJECTS"}]}]}},"_links":{"self":[{"href":"https:\/\/www.consealsdnbhd.com\/index.php\/wp-json\/wp\/v2\/pages\/13"}],"collection":[{"href":"https:\/\/www.consealsdnbhd.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.consealsdnbhd.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.consealsdnbhd.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.consealsdnbhd.com\/index.php\/wp-json\/wp\/v2\/comments?post=13"}],"version-history":[{"count":24,"href":"https:\/\/www.consealsdnbhd.com\/index.php\/wp-json\/wp\/v2\/pages\/13\/revisions"}],"predecessor-version":[{"id":505,"href":"https:\/\/www.consealsdnbhd.com\/index.php\/wp-json\/wp\/v2\/pages\/13\/revisions\/505"}],"wp:attachment":[{"href":"https:\/\/www.consealsdnbhd.com\/index.php\/wp-json\/wp\/v2\/media?parent=13"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}