PROJECT LRT

SUNWAY CONSTRUCTION SDN BHD

MICROPILE , ROCK HAMMERING WORKS
SUNWAY (PUTRAHEIGHT) THE CONSTRUCTION AND COMPLETION OF FACILITIES WORKS (PACKAGE B) FOR THE KELANA JAYA (KLJ) LINE EXTENSION PROJECT (the “works”) PRASARANA/GCS/CTT/2.0326/2011 & (USJ 8) KELANA JAYA LINE EXTENSION PROJECT THE CONSTRUCTION AND COMPLETION OF FACILITIES WORKS (PACKAGE B1 & B2 : FROM CH 9250 TO CH 17350) MICROPILES AT STATION 8 (USJ 9) KELANA JAYA LINE EXTENSION PROJECT THE CONSTRUCTION AND COMPLETION OF FACILITIES WORKS (PACKAGE B1 & B2 : FROM CH 9250 TO CH 17350) MICROPILES AT STATION 9

PROJECT BRT

SUNWAY CONSTRUCTION SDN BHD

MICROPILE WORKS
SUNWAY CADANGAN MEREKABENTUK, MEMBINA, MELENGKAP, MENYIAPKAN DAN MENYELENGGARAKAN KERJA-KERJA 1) LALUAN BAS DAN HENTIAN BAS; 2) DEPOT; 3) TEMPAT LETAK KERETA BERTINGKAT; 4) “ MECHANIZATION OXIDATION POND” UNTUK BAS RAPIT TRANSIT (“BRT”) – LALUAN SUNWAY

PROJECT TNB MANJUNG POWER SUPPLY FACTORY

ONLINE ENGINEERING SERVICES SDN BHD

MICROPILE WORKS
KERJA-KERJA MEMBAIKPULIH MENDAPAN STRUKTUR TAPAK ASAS DI LAPANGAN SUIS PMU 500KV JANAMANJUNG BAGI PEJABAT PENGURUS NEGERI (PERAK), JABATAN SENGGARAAN ASET, BAHAGIAN PENGHANTARAN TNB

PROJECT MEX 1 HIGHWAY

PEMBINAAN MELIMA (M) SDN. BHD

MICROPILE WORKS
MEX1 – PROTECTION TO ABUTMENT AT SG.KERAYONG
SUB-CONTRACT FOR MICROPILING WORK

PROJECT PARADIGM JB MALL

WCT HOLDINGS BERHAD

MICROPILES & UNDERPINNING WORKS
WCT PEMBANGUNAN PERDAGANGAN 22 TINGKAT YANG MENGANDUNGI 10 TINGKAT PODIUM YANG MNEGANDUNGI 6 TINGKAT KOMPLEKS MEMBELI BELAH – 2 TINGKAT APARTMENT SERVIS (8 UNIT) KEMUDAHAN DAN 2 TINGKAT LETAK KENDERAAN BERSERTA 1 TINGKAT LETAK KENDERAAN BAWAH TANAH 22 TINGKAT MENARA A APARTMENT SERVIS (225 UNIT) DI ATAS LOT PTD 32665 , JALAN MEWAH RIA 2, TAMAN BUKIT MEWAH, MUKIM TEBRAU, DAERAH JOHOR BAHRU.

PROJECT SKYPARK CYBERJAYA

DYNABRIDGE SDN NHD

BORED PILES & CBP WORKS
CADANGAN PEMBANGUNAN KOMPLEKS PERNIAGAAN YANG MENGANDUNGI HOTEL, SOHO, PEJABAT,RUANG PERNIAGAAN DAN TEMPAT LETAK KERETA DI ATAS LOT 11992, JALAN TEKNOKRAT 1, CYBER 3, MUKIM DENGKIL, DAERAH
SEPANG, SELANGOR (SKYPARK-CYBERJAYA)

PROJECT MRT

CHINA RAILWAY 17TH BUREAUGROUP (M) SDN BHD

MICROPILE WORKS
MRT V201 PACKAGE V205 CRCC PROJECT MAS RAPIT TRANSIT LALUAN 2 SUNGAI BULOH – SERDANG – PUTRAJAYA (SSP) PACKAGE S205 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT SUNGAI BESI, TECHNOLOGY PARK & SERDANG RAYA (NORTH) MICRO PILE WORKS FOR SUNGAI BESI STATION & SERDANG RAYA NORTH STATION

PROJECT ULU JELAI HYDRO ELECTRIC

GPSS GEOTECHNIC SDN BHD

SOIL NAILING, GUNITING & HORIZONTAL DRAIN WORKS
ULU JELAI HYDRO ELECTRIC PROJECT ~ ACCESS ROAD TO LEMOI INTAKE AND BRIDGE OVER SG.LEMOI ~ ACCESS ROAD TO LEMOI INTAKE AND BRIDGE OVER SG.LEMOI

PROJECT MOUNT ERSKIN

VST CEMERLANG SDN. BHD.

MICROPILE WORKS
CADANGAN PEMBANGUNAN PERUMAHAN UNTUK MENDIRIKAN:
A) 2 BLOK 38 TINGKAT PANGSAPURI KOS SEDERHANA (473 UNIT) TERMASUK 6 TINGKAT TEMPAT LETAK KENDERAAN DAN 1 TINGKAT KEMUDAHAN MASYARAKAT/ RUANG REKREASI.
B) 1 BLOK 21 TINGKAT RUMAH PANGSA KOS SEDERHANA RENDAH (142 UNIT) TERMASUK 4 TINGKAT TEMPAT LETAK KENDERAAN DAN 1 TINGKAT KEMUDAHAN MASYARAKAT/ RUANG REKREASI
JALAN MOUNT ERSKIN, DIA ATAS LOT 3618, MUKIM 18, DAERAH TIMUR LAUT, PULAU PINANG UNTUK TETUAN VISENTAK CAPITAL SDN BHD

PROJECT IOI PROPERTIES

IOI PROPERTY SDN BHD

MICROPILE WORKS
MICROPILE AT SOUTHERN TRUMPET TUNNEL AND RAMP FOR CADANGAN PEMBANGUNAN PERNIAGAAN SECARA BERFASA YANG MELIBATKAN :- FASA 2 DI ATAS PT 83 DAN PT 50430, IOI RESORT CITY, MUKIM DENGKIL DAERAH SEPANG, SELANGOR DARUL EHSAN UNTUK TETUAN MAYANG DEVELOPMENT SDN BHD

PROJECT 3 ELEMENTS

SAFETAGS SOLUTION SDN BHD

MICROPILING AND SLOPE STRENGTHENING WORKS
3 ELEMENTS SRI KEMBANGAN, PHASE 2 CADANGAN PEMBANGUNAN PUSAT PERNIAGAAN 28 TINGKAT YANG MENGANDUNGI :- I) 3 TINGKAT TEMPAT LETAK KERETA (TINGKAT BESMEN,TINGKAT BAWAH & 1), II) 4 TINGKAT PODIUM PERNIAGAAN (TINGKAT1-4), III) 5 TINGKAT TEMPAT LETAK KERETA (TINGKAT 5-9), IV) 1 BLOK (342 UNIT) PANGSAPURI PERKHIDMATAN 18 TINGKAT (TINGKAT 10-27), V) 1 UNIT PERHENTIAN BAS DI ATAS LOT 100010 (PT73891), PERSIARAN PUTRA PERMAI SELESA, PUSAT BANDAR PUTRA PERMAI, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN SAFETAGS SOLUTION SDN BHD

PROJECT PAVILLION

GBC INTERIOR & ENGINEERING WORKS

MICROPILE WORKS
RECONFIGURE MRT PORTALS @ PAVILION DAMANSARA HEIGHT
168, BUKIT BINTANG STREET, BUKIT BINTANG, 55100 KUALA LUMPUR,
FEDERAL TERRITORY OF KUALA LUMPUR

PROJECT URBAN WELLNESS PULAI JOHOR

ML BORED PILES SDN BHD

GROUND ANCHOR
PROPOSED ‘URBAN WELLNESS’ DEVELOPMENT FOR PULAU INDAH VENTURES SDN BHD. KOMPLEKS BANGUNAN “URBAN WELLNESS” DI ATAS LOT PTD 17069 MUKIM PULAI, JOHOR BAHRU, JOHOR

PROJECT KTM

JASMADU – MKH BERHAD

BORED PILE, MICROPILE & SPUN PILE WORKS
TENDER FOR PILING & SUB-STRUCTURE WORKS FOR CADANGAN PEMBANGUNAN MENDIRIKAN SEBUAH STESEN KOMUTER BERSEPADU KAJANG 2 BERSERTA KEMUDAHAN SOKONGAN IAITU: – FASA 1 BANGUNAN STESEN KOMUTER 2 TINGKAT DENGAN KEMUDAHAN SOKONGAN (TERMASUK PEJABAT PENGURUSAN KIOSK JUALAN TIKET, PUSAT PENERANGAN PERLANCONGAN, SURAU & PENCAWANG ELEKTRIK TNB) DAN JEJANTAS PEJALAN KAKI YANG BERBUMBUNG KE KOMPLEKS PERHENTIAN KAJANG DI ATAS LOT SEBAHAGIAN REZAB PERBADANAN ASET KERETAPI DAN LOT 853, MUKIM KAJANG, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN PERBADANAN ASET KERETAPI (RAILWAY ASSET CORPORATION)JEJANTAS PEJALAN KAKI YANG BERBUMBUNG KE KOMPLEKS PERHENTIAN KAJANG DI ATAS LOT SEBAHAGIAN REZAB PERBADANAN ASET KERETAPI DAN LOT 853, MUKIM KAJANG, DAERAH HULU LANGAT, SELANGOR UNTUK TETUAN PERBADANAN ASET KERETAPI (RAILWAY ASSET CORPORATION)

PROJECT FOREST CITY

CHINA STATE CONSTRUCTION ENGINEERING (M) SDN BHD

GUNITING WORKS
FOREST CITY LANDMARK PHASE 1. FOREST CITY COUNTRY GARDEN FOREST CITY 1, PULAU SATU, GELANG PATAH, 81550 JOHOR BAHRU, JOHOR (187.27 MI)
JOHOR BAHRU

PROJECT MRT

SUNWAY CONSTRUCTION SDN BHD

SOIL NAILING WORKS
PROJEK MASS RAPID TRANSIT LEMBAH KELANG: JAJARAN SUNGAI BULOH – KAJANG PACKAGE V4: CONSTRUCTION AND COMPLETION OF VIADUCT GUIDEWAY AND OTHER ASSOCIATED WORKS FROM SECTON 17 TO SEMANTAN PORTAL. – MRT